Skip to main content
SwiftCase
PlatformForward-deployedSwitchboardFeaturesSolutionsCase StudiesFree ToolsPricingAbout
Book a Demo
SwiftCase

Workflow automation for UK service businesses. Created in the UK.

A Livepoint Solution

Platform

  • Platform Overview
  • Workflow Engine
  • Case Management
  • CRM
  • Document Generation
  • Document Extraction
  • Context Graph
  • Data Model
  • Integrations
  • Analytics

Switchboard

  • Switchboard Overview
  • Voice AI
  • Chat
  • Email
  • SMS
  • WhatsApp

Features

  • All Features
  • Claims Operations
  • High-Volume Operations
  • Multi-Party Collaboration
  • Contract Renewals
  • Compliance & Audit
  • Pricing
  • Case Studies
  • Customers
  • Why SwiftCase

Company

  • About
  • Our Team
  • Adam Sykes
  • Nik Ellis
  • Implementation
  • 30-Day Pilot
  • Operations Pressure Map
  • For Your Role
  • Peer Clusters
  • Engineering
  • Careers
  • Partners
  • Press
  • Research
  • Tech Radar
  • Blog
  • Contact
  • SwiftCase Signal

Resources

  • Use Cases
  • Software
  • ROI Calculator
  • Pressure Diagnostic
  • Pilot Scope Estimator
  • Board Case Builder
  • Free Tools
  • Guides & Templates
  • FAQ
  • Compare
  • Best Practices
  • Changelog
  • Documentation
  • Help Centre

Legal

  • Privacy
  • Terms
  • Cookies
  • Accessibility

Stay in the loop

Cyber Essentials CertifiedGDPR CompliantUK Data Centres

© 2026 SwiftCase. All rights reserved.

  1. Home
  2. Guides
  3. Fire Safety
  4. Running a Fire Door Inspection Programme Under the 2022 Regulations
Regulation 10Door Registers

Running a Fire Door Inspection Programme Under the 2022 Regulations

The Fire Safety (England) Regulations 2022 turned fire door checks in taller residential buildings into a recurring duty with a record. This guide sets out how an inspection practice runs that programme across thousands of doors without losing one.

9 min readLast updated 2026-08-22Last verified 2026-08-22

Thousands of Doors, Two Cycles, One Record Each

Regulation 10 of the Fire Safety (England) Regulations 2022, in force from 23 January 2023, requires the Responsible Person for a multi-occupied residential building over 11 metres to carry out checks of fire doors in the common parts at least every three months, and to use best endeavours to check flat entrance doors at least every twelve months. Residents in all multi-occupied residential buildings must be given information about fire doors. The checks have to be recorded, and the record has to be available to the fire and rescue authority.

For a single block that is manageable. For an inspection practice engaged by housing providers and managing agents across hundreds of blocks, it is tens of thousands of doors on two different cycles, each door with its own history of inspections and defects, and each block with a Responsible Person who will be asked for the record. A door missed in a quarter is a breach; a door with no record is indistinguishable from a door never checked.

The work itself is repetitive and physical: gaps, seals, closers, glazing, hinges, signage, the door's integrity, whether it closes fully from any angle. The failure modes are operational. Inspectors checking doors from a printed list, photographs that cannot be matched to a door, defects reported in an email that never becomes a job, and no way to show a fire officer which doors were checked when.

A Register of Doors, Each One a Record That Carries Its Own History

Start with a register: every fire door in scope, identified uniquely, with its location, type, classification and the cycle it belongs to. The register is the asset list the programme runs on. Each inspection is recorded against the door, not against the block, so a door's history is its own: when it was checked, by whom, what was found, what was done about it.

Inspections are scheduled from the register by cycle and routed by building, so an inspector arrives at a block with the list of doors due, in order, on a device. Each check is a structured form that mirrors what a competent inspection covers, with a photograph attached to each defect. A defect raises an action on the spot, with a priority and an owner, so it becomes work rather than a line in a report.

The record the Regulations require then exists as a by-product: for any block, which doors were checked in which quarter, what was found, what was fixed, and what is still open. The Responsible Person can produce it on request and the practice can show its own programme is complete, block by block, cycle by cycle.

Every door in scope is in a register with its own cycle and its own history
Inspections are scheduled from the register, so a quarter cannot end with doors unchecked and nobody knowing
Each check is a structured form with photographs attached to the door and the defect
Defects become tracked actions with an owner and a priority the moment they are found
The record the Regulations require is produced from the programme, not assembled afterwards
Compliance is visible block by block: checked, due, overdue, defects open

How to Set Up the Programme

Follow these steps to build a fire door inspection programme that runs on its own cycles and leaves the record the fire authority will ask for.

1

Build the door register

Survey each building in scope and record every fire door: a unique reference, location, whether it is a common parts door or a flat entrance door, its type and certification where known, and any defects found at the survey. The register is the foundation; a door that is not on it will not be inspected.

Label the doors physically with the register reference. It removes the single biggest source of error, which is recording a check against the wrong door.
2

Assign each door to a cycle

Common parts doors go on the quarterly cycle; flat entrance doors on the annual cycle, with the best endeavours duty recorded where access is refused. Buildings under 11 metres and non-residential premises still carry the general duty under the Order to maintain fire doors, so decide and record the cycle the practice applies to them too.

Record access refusals for flat entrance doors as events on the door. Best endeavours has to be evidenced, and a pattern of refusals is something the Responsible Person needs to know.
3

Schedule inspections from the register and route them

Let the cycle generate the inspections due, grouped by building and ordered by floor, so an inspector works through a block methodically. The schedule should show what is due this quarter, what has been done and what is at risk of being missed before the quarter ends.

Plan the quarter so that no block is left to the last week. A missed quarter is a breach, and late inspections cluster when the schedule is passive.
4

Inspect with a structured form, photograph by photograph

The inspection form covers what a competent check covers: the door closes fully and latches from any angle, gaps within tolerance, intumescent strips and smoke seals intact, closer working, hinges sound, glazing intact and appropriate, signage present, no damage to the leaf or frame. Each item is answered, and each defect has its photograph attached to it on the door record.

Make the form stop the inspector leaving a door with unanswered items. An incomplete check is not a check.
5

Raise defects as actions on the spot

A defect found on a door becomes an action immediately, with a priority, a target date and an owner at the Responsible Person's organisation. Urgent defects, a door that does not close or a missing door, escalate straight away. The inspector does not write a report for someone else to turn into jobs.

Link the action to the door, not only to the building. When the repair is done, the evidence closes the action on the door's own history.
6

Verify repairs and close on evidence

A defect closes when there is evidence the repair was done properly: the contractor's record, a photograph, or the inspector's own re-check at the next visit. The door's history then shows the defect, the repair and the verification, in order.

Decide which defect types the practice will close on contractor evidence and which it re-checks itself, and apply the rule consistently.
7

Report compliance to the Responsible Person, and keep the record

Each quarter, give the Responsible Person a record for each block: doors in scope, doors checked and when, defects found, defects closed and open, access refusals. Keep the same record for the practice. That is the document a fire officer will ask for, and it should take minutes to produce, not days.

Give residents the fire door information the Regulations require through the same programme, and record that it was provided.

Best Practices

One door, one record, for its whole life

The value of the register compounds. A door with three years of checks, two defects and two verified repairs is a door whose condition can be trusted. A door with a report from last quarter is a snapshot.

Use competent inspectors and record their competence

The Regulations do not prescribe a qualification for the quarterly checks, but the Responsible Person has to be able to show the checks were adequate. Inspectors trained to a recognised scheme, with their competence recorded, make that straightforward.

Photograph every defect and every repair

Two photographs of the same door, before and after, with dates, settle most questions about whether a repair was done. Attach both to the door.

Escalate non-closing doors immediately

A fire door that does not close is not a defect for the next report. It is an immediate risk to every person the door protects, and the Responsible Person needs to know today.

Watch the quarter, not the month

Report the state of the quarterly cycle weekly inside the practice: checked, due, at risk. The breach happens at the quarter end, and by then it is too late to recover.

Keep flat entrance door refusals as evidence

The annual check of flat entrance doors is a best endeavours duty. The evidence of best endeavours is the record of attempts, notices and refusals, door by door.

Implementation Checklist

Every fire door in scope is in the register with a unique reference and a physical label
Each door assigned to a cycle: quarterly for common parts, annual for flat entrance doors
Cycle decided and recorded for buildings under 11 metres and non-residential premises
Inspections generated from the register and routed by building and floor
Structured inspection form with every item answered and photographs attached to defects
Defects raised as actions on the door with a priority, owner and target date
Non-closing or missing doors escalated immediately
Repairs closed on evidence, with the closure rule recorded
Flat entrance door access refusals recorded as events on the door
Quarterly record per block produced for the Responsible Person and kept by the practice
Resident fire door information provided and recorded
Free Tool

SLA Builder

Set turnaround targets for write-up, QA and issue, and timings for review reminders.

Try It Free

Frequently Asked Questions

Related Guides

fire safety

Fire Risk Assessment Workflow: From Instruction to Issued Report

A fire risk assessment is a legal record as much as a piece of advice. This guide sets out a workflow that takes a practice from instruction to an issued, defensible report, at the volume a working practice has to handle.

fire safety

Tracking Fire Risk Assessment Actions Through to Completion

An assessment is only as good as what happens to its findings. This guide sets out how to turn the action plan into tracked work with owners, dates and evidence, across every client the practice holds.

fire safety

Fire Risk Assessor Competence and Report QA: Standing Behind Every Report

Since October 2023 a Responsible Person may only appoint a competent person to help with their fire risk assessment. This guide sets out how a practice evidences competence for every assessor and every building, and how it checks reports before they go out.

Further Reading

Data model: A register of doors, each its own record with its own history, defined to your fields.Document extraction: Inspection photographs and forms read into the door's record on site.Property inspection scheduling guide: Scheduling recurring inspections across a portfolio.Building Safety Act compliance guide: The wider regime for accountable persons and higher-risk buildings.

Never End a Quarter With Doors Unchecked

Bring us a block and its door list and we will show you what the programme looks like: the register, the cycles, the inspection form, the defects as actions and the quarterly record.

Book a Discovery CallSee how a register is built